dimond to dowling map smallThis Design Study Report (DSR) was prepared in support of the New Seward Highway (NSH) Rabbit Creek to 36th Ave. Reconstruction Project from East Dimond Boulevard to the termination of the previous phase at W. Dowling Road.  The design of 36th Ave. to Dowling Road, which expands the NSH from 4 to 6 lanes, is complete with construction scheduled to being in late 2011.
Based on the expected population growth and economic development predicted in the Anchorage Bowl comprehensive plan and Anchorage long-range transportation plan, additional capacity needs to be developed for the New Seward Highway in order to meet a future increase in travel demand within the corridor.  
 
 

Community Partner

  • Alaska Department of Transportation and Public Facilities (ADOT&PF)

 

Project Lead

  • James Amundsen P.E., Chief, Highway Design (ADOT&PF)
  • Osama A. Abaza, Ph.D., Professor and Chair, UAA
 

Team

  • Matthew Balzarini
  • Brittany Barkshire
  • Magdalena Budzyn-McAleenan
  • Anna Ferntheil
  • James Hart
  • Kristofer Homerding
  • John Oldfield
  • Craig Parkinson
  • Nicholas Phelps
  • Michael Rhodes
  • Jacob Tracy
  • Irene Turletes
  • Michael Ulmgren