Join us to celebrate the "Topping Out" of UAA's new
Engineering & Industry Building!

Friday, Dec. 6
10:45 a.m. Beam signing - all are welcome
11 a.m. Topping Out Ceremony
Engineering and Industry Building Jobsite

Refreshments to follow in the Student Union Cafeteria

"Topping out" is the term used by ironworkers to indicate that the final piece of steel has been hoisted into place on a building, bridge or other large structure. This ceremony marks the progress being made on the Engineering and Industry Building as it reaches its maximum height. Please join in celebrating this construction milestone by signing this final piece of steel before it is lifted to the top of the building. The ceremony will be held outdoors with refreshments to follow inside the Student Union. Please dress warmly! 

Parking on campus is free on Friday and is recommended in the West Campus Central Lot or Sports Center West Lot.


 R.S.V.P.


 
   
   
 
 
 

Event Parking Map