Moose Creek Bridge

moose creek bridge plan small


For this project, ADOT&PF is planning to realign the Glenn Highway between MP 53 and MP 56.  A bridge type study was conducted, and the following design alternatives were evaluated:

  • Precast, prestressed concrete decked bulb-tee;
  • Steel plate girder with concrete deck;
  • Trapezoidal steel box girder with concrete deck; and
  • Cast-in-place, post-tensioned concrete box girder.

Each alternative was evaluated for estimated cost, design criteria satisfaction, and construction methodology to determine the most feasible bridge type for this project.


moose creek bridge students medium


Project Documents


Community Partner

  • Alaska Department of Transportation and Public Facilities (ADOT&PF)

Project Lead

  • Sean Baski, P.E,., Project Manager (ADOT&PF)
  • James Amundsen, P.E., Chief, Highway Design (ADOT&PF)
  • Scott Hamel, P.E., Ph.D., Professor, UAA


  • Michael Beauvais
  • Liam Gibcus
  • Newell Pangulayan
  • Hunter Seibold